ANDERSON COLUMBIA CO., INC.
Construction For The

bypass bridge in La JOYA, TX

  • Florida
    • ACCI Florida Division
    • Junction City Mining
    • A Mining Group
    • Asphalt Technologies
    • Corridor Mining
  • Texas
    • ACCI Texas Divison
  • What We Do
    • Our Story
    • Doing Business with ACCI
    • Sustainability Policy
    • Affiliates >
      • A Mining Group
      • Asphalt Technologies
      • Corridor Mining
      • Junction City Mining
    • News Bulletin
    • Affiliate News Magazine
    • For Sale
  • ACCI In Action
    • Videography
    • Photography
  • Join Our Team
    • Why Work For Anderson
    • Available Positions
  • Contact Us

what we'RE DOING

Picture
The overall length of the project is about four miles; with the flyover bridge, which connects back to State Highway 83, being 440’ long.  In addition to the flyover bridge and a 50’ wildlife crossing bridge, two other bridges spanning over La Joya Lake are being place by our crew.  Both bridges are 3450’ long.  The frontage roads being constructed are all new construction and are 38’ wide with 7” of asphalt treated base and 3” of SMA-D Hotmix.

Contact Us​
News Bulletin
​Careers
For Sale
FL Division
Work With Us
​TX Division
What We Do
Picture
People Are Our Greatest Asset.
​
ANDERSON COLUMBIA
Copyright © 2022

  • Florida
    • ACCI Florida Division
    • Junction City Mining
    • A Mining Group
    • Asphalt Technologies
    • Corridor Mining
  • Texas
    • ACCI Texas Divison
  • What We Do
    • Our Story
    • Doing Business with ACCI
    • Sustainability Policy
    • Affiliates >
      • A Mining Group
      • Asphalt Technologies
      • Corridor Mining
      • Junction City Mining
    • News Bulletin
    • Affiliate News Magazine
    • For Sale
  • ACCI In Action
    • Videography
    • Photography
  • Join Our Team
    • Why Work For Anderson
    • Available Positions
  • Contact Us