ANDERSON COLUMBIA
  • Florida
  • Texas
  • What We Do
    • Our Story
    • Doing Business with ACCI
    • Affiliates >
      • A Mining Group
      • Asphalt Technologies
      • Corridor Mining
      • Junction City Mining
    • News Bulletin
    • Affiliate News Magazine
    • For Sale
  • Careers
  • Contact Us
Construction and Paving For The

Weslaco Mid valley airport

what we DID

Picture
This project consisted of two phases: Phase I was the removal of existing Sugar Cane Road with a new Cul-de-Sac and a turn around on Joe Stephens Ave. and a relocation of a 16” waterline. Phase II of the project called for the widening of the existing runway 2.5’ to both sides of the runway, repairs to the existing 72” and 60” RCP, removal of existing head wall and an 80 LF extension to the 72” and 60” RCP with new Headwall. Our crew also replaced the existing TYCC inlet grate with a stainless steel one. New 3” overlay on the taxiways and runway, while sealing the airplane staging area and 3” overlay with new tie down anchors and new pavement marking and side markers.

Social
Contact Us​
News Bulletin
​Careers
For Sale
Florida Division
Do Business With Us
​Texas Division
What We Do
NONE OF US IS AS SMART AS ALL OF US
ANDERSON COLUMBIA
Copyright © 2020
Picture
  • Florida
  • Texas
  • What We Do
    • Our Story
    • Doing Business with ACCI
    • Affiliates >
      • A Mining Group
      • Asphalt Technologies
      • Corridor Mining
      • Junction City Mining
    • News Bulletin
    • Affiliate News Magazine
    • For Sale
  • Careers
  • Contact Us