what we DID
This scope of work included the parking lots for the North and South ends of the first building with 2” of Light-Duty asphalt, and the West and East ends of the building with 3” of Heavy-Duty asphalt. The project also required our crew to pave Carrier Drive and Uniroyal Drive, both which are access roads to the subdivision. The type of mix for this whole job was HMA TY C PG 70-22, and we placed about 11,000 tons in total.