what we DID
Our crew added two more lanes, with road widening on the West side and 42’ concrete paving on the East side. Barrier walls were installed to separate traffic while each new lane to be added was milled down 7” on the old asphalt shoulder. A 4” bond breaker and 14” of lime rock and concrete mix was installed as well.