what we DID
Our crew extended runways, taxiways, aprons and added underground utilities, signage and lighting that gave the airport a major upgrade in air traffic facilities. Runway 35 right was extended 450’ to the South with 17” of concrete and a 6” asphalt bond breaker being placed prior to the concrete. The entire project saw 30,000 cubic yards of concrete utilized.