what we did

Our crew milled the runway down to its lime rock base. A total of 6,700 tons of base was applied at a depth of 2” and 6,700 tons of friction was paved using P401 Mix. Our crew also performed the critical MOT runway closers using the lighted “X” configuration at the end of the runway for non-use signalization.